How to order roof framing
A well-prepared roof framing order means a quicker quote and fewer surprises on site. Here is what to have to hand.
Start with the timber schedule
The structural engineer sets the sections and lengths of the roof members in the building plans. The easiest basis for a quote is the timber schedule: a list of members with name, section, length and number of pieces.
If your drawings do not include one, ask the designer or the site manager for it. A roof drawing on its own is also enough to get started.
What a roof frame is made of
- wall plates, which sit on the walls and take the load of the roof,
- rafters, the sloping timbers under the battens and covering,
- purlins, which support the rafters along the length of the roof,
- collar ties, the horizontal timbers joining pairs of rafters,
- posts and braces, which support and stiffen the structure.
Cut to size or with an allowance
Agree with your carpenter whether the members should arrive cut exactly to size or with an allowance to trim on site. It depends on how the crew works and how closely the building matches the drawings.
Treatment
Structural roof timber is usually protected against fungi and insects. The requirements come from the design. At Tartak WALD-MAR timber is treated on request, so just mention it in your request.
Timing and storage
It is best to collect the timber shortly before the carpentry starts. Until then, keep it on bearers, with spacers between the layers and under a cover, rather than tightly wrapped in plastic.
What to put in your request
- the timber schedule or a roof drawing,
- the type of roof and rough building dimensions,
- whether the timber should be treated,
- when you need the timber and whether you will collect it.