Request

How to store timber on site

Freshly sawn timber gives off water and moves as it does. How you stack it decides whether the boards stay straight.

Timber dries and moves

Freshly sawn timber holds a lot of water and gradually releases it into the air. As it dries, it shrinks. If it dries unevenly, boards can bow, twist or split at the ends.

Off the ground

Build the stack on level, stable bearers so that no board touches the ground or sits where water collects. The base needs to be level, because a stack on uneven ground passes the unevenness on to the timber.

Spacers in line

Put dry sticks, known as spacers, between the layers. Space them evenly and place each one directly above the one below, so the weight goes straight down. Air can then move through the whole stack and the boards do not sag between supports.

A cover, not airtight plastic

Protect the top of the stack from rain and strong sun, for example with a board or an overlapping tarpaulin. Leave the sides open. Timber wrapped tightly in plastic cannot release moisture and easily develops mould or blue stain.

A tidy stack

  • keep boards of the same length and thickness together,
  • line up the ends on one side of the stack,
  • put the heaviest pieces at the bottom,
  • you can weigh down the top to hold the upper layers flat.

Shortly before fitting

The less time timber spends waiting on site, the lower the risk. Time the collection to match the work and order what you need for the next stage.

Read next

Back to the guide
  • How to order roof framing

    What to prepare before ordering roof framing: the timber schedule from your plans, the parts of the roof, cutting allowances, treatment and timing.

    4 min read

  • How to prepare logs for sawing

    Your own timber from woodland or a plot: how to prepare the logs before they go to the sawmill and what to put on your cutting list.

    3 min read

Choose a number